Juniper-networks MX480 Manual de usuario Pagina 105

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 366
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 104
Figure 46: Reinstalling an FPC
OK
MASTER
F
AN
ONLINE
OFFLINE
0
1
1
0
F
AI
L
F
AI
L
PEM
F
AI
L
F
AI
L
F
AI
L
F
AI
L
F
AI
L
F
AI
L
ESD
OK
OK
OK
OK
OK
OK
OK
2
3
4
5
ACO/
L
T
Y
EL
L
OW
ALARM
RED
ALARM
NC
NO
C
NC
NO
C
MX480
REO
RE1
0
1
2
3
g004405
Related
Documentation
Preventing Electrostatic Discharge Damage to an MX480 Router on page 248
Tools Required to Install the MX480 Router with a Mechanical Lift on page 69
Removing Components from the MX480 Router Before Installing It with a Lift on
page 69
Installing the MX480 Router Using a Mechanical Lift on page 74
Installing the MX480 Router Cable Management Bracket on page 81
Installing the MX480 Router Cable Management Bracket
The cable management brackets attach to both sides of the router. To install the cable
management brackets (see Figure 47 on page 82):
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
the strap to one of the ESD points on the chassis.
2. Position the cable management brackets on the front sides of the chassis.
3. Insert the tabs into the slots.
4. Tighten the captive screws completely.
81Copyright © 2013, Juniper Networks, Inc.
Chapter 7: Installing the MX480 Router with a Mechanical Lift
Vista de pagina 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 365 366

Comentarios a estos manuales

Sin comentarios